Compare a defined supply package at a named location.
Review product units, transport and unloading alongside the supplier’s material price.
Set the destination before comparing
A quotation for one site should not be assumed to apply unchanged to another. State the delivery destination, requested timing and whether collection or delivery is being priced. Confirm access and receiving arrangements with the relevant parties.
Give suppliers the same basis
Use a common specification, quantity and commercial unit. Record the quotation date, validity, included services and unresolved questions. Supply-only rates and complete installed items have different boundaries.
Check the block example
A wall 10 × 3 m has 30 m² gross area. Subtracting 4 m² of openings leaves 26 m². Dividing by a nominal 0.4 × 0.2 m face gives 325 blocks. Adding the selected 5% allowance and rounding up gives 342 blocks.
At illustrative INR45 per unit, the block subtotal is INR15,390. The 400 × 200 mm face is only a nominal demonstration input, not a standard Indian AAC or block size. Confirm the actual product and wall details.
Review the work outside the unit price
Mortar, grout, reinforcement, lintels, finishes, labour, transport and tax are separate. Identify unloading equipment, the drop-off point, handling to the work area and available storage. Ask whether phased deliveries change the commercial package.
- Confirm product dimensions and pack size.
- List known transport charges separately.
- Record unloading responsibility.
- State whether tax is included or excluded without assuming treatment.
- Reconfirm after a destination, quantity or timing change.
TB helps calculate quantities and plan purchases. It does not reserve stock, calculate a transport route or arrange delivery. Use the reviewed estimate for a clearer supplier conversation, then confirm the actual agreement directly.